![]() |
A thorough renovation of our hallways was finished in October 2007, complete with a new color palette, new light fixtures, new signage and a series of beautiful photographs generously donated by photographer Hiroyuki Matsumoto (#20B) that currently hang in each floor of our building Posted: 12/06/2007 |
|
The storefronts have gone through a significant renovation to unify the Third Avenue and 16th Street façades with a stepped granite base and Indiana limestone slabs. New light fixtures and roll-down gates were installed as well as a new, cohesive awning system. The same treatment was later implemented for the entrance of the building and a new entrance awning canvas replaced the old one. We also repaved our damaged sidewalks and are in the process of putting the finishing touches on the tree guards. Additionally, we are happy to report that the catch basin in the corner of Third Avenue & 16th Street is scheduled to be re-opened next year by the Department of Design & Construction. Posted: 12/06/2007 |